首页> 外文期刊>Engineering news-record >Indiana P3 Work Restarts
【24h】

Indiana P3 Work Restarts

机译:印第安纳州P3工作重新开始

获取原文
获取原文并翻译 | 示例
       

摘要

The problems have been piling up for Section 5 of I-69 in Indiana, a segment that involves 21 miles of upgrades to existing state Highway 37 from Bloomington to Martinsville. The state awarded the concession in 2014 to I-69 Development Partners. One of the key investors in that company, Spain's Grupo Isolux Corsan Finance B.V., sold its interest in the concessionaire in May, as parts of the parent company headed into bankruptcy. But another part of Grupo Isolux Corsan is serving as the design-build contractor for the concessionaire. The design-builder failed to keep up with payments to its subcontractors, triggering a walk-off that stopped some work for a while. Officials at a key subcontractor, Crider & Crider, could not be reached for comment, but it has since resumed work, according to local media.
机译:问题一直在为印第安纳州I-69州际公路的第5部分堆积,该部分涉及将现有的37号州际公路从布卢明顿升级到马丁斯维尔,需要21英里的升级。该州于2014年将特许权授予I-69开发合作伙伴。该公司的主要投资者之一,西班牙的Grupo Isolux Corsan Finance B.V.于5月出售了其在特许公司中的权益,因为母公司的一部分已经破产。但是,Grupo Isolux Corsan的另一部分是特许公司的设计建造承包商。设计制造商未能跟上向其分包商的付款,从而触发了罢工,从而使某些工作暂时停止了。当地媒体称,未能与关键分包商Ccrider&Crider的官员发表评论,但此后恢复了工作。

著录项

  • 来源
    《Engineering news-record》 |2016年第9期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号