首页> 外文期刊>Engineering news-record >Charlotte and LaGuardia Work Takes Off, Philadelphia Runway on Hold
【24h】

Charlotte and LaGuardia Work Takes Off, Philadelphia Runway on Hold

机译:夏洛特和拉瓜迪亚的工作开始,费城跑道搁置

获取原文
获取原文并翻译 | 示例
       

摘要

Lauren Keeley gestured at the sprawling Terminal B at LaGuardia International Airport, where some of the 14.3 million annual users were standing in a taxi line at the curb. "This building will be a taxiway," says the design-build coordinator for the Skanska-Walsh joint-venture team. Within 39 months, some of those passengers should be using parts of a new 1.3-million-sq-ft, 35-gate terminal that will sit some 600 ft farther south, near the Grand Central Parkway, thanks to the first public-private partnership for a replacement terminal in the U.S.
机译:劳伦·基利(Lauren Keeley)在拉瓜迪亚国际机场(LaGuardia International Airport)庞大的B航站楼里打了个手势,每年1,430万用户中的一些人站在路边的出租车线上。 Skanska-Walsh合资团队的设计-建造协调员说:“这座建筑将成为一条滑行道。”在39个月内,部分乘客应使用新的130万平方英尺,35个登机口的航站楼的一部分,该航站楼将位于大中央公园路附近,向南约600英尺,这要归功于首次公私合作在美国更换终端

著录项

  • 来源
    《Engineering news-record》 |2016年第9期|20-22|共3页
  • 作者

    Aileen Cho;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号