首页> 外文会议>Mid-Atlantic industrial and hazardous waste conference >Groundwater remediation system for the runway 8-26 development project: philadelphia international airport, philadelphia, pa
【24h】

Groundwater remediation system for the runway 8-26 development project: philadelphia international airport, philadelphia, pa

机译:8-26号跑道开发项目的地下水修复系统:宾夕法尼亚州费城国际机场

获取原文

摘要

The City of Philadelphia Department of Aviation (DOA) is in the process of constructing a new 5,000-foot-long commuter runway (Runway 8-26) to be located to the northeast of the current Philadelphia International Airport. This runway will provide needed capacity to handle smaller commuter planes, thereby relieving congestion on the two main 11,000-foot runways at the Airport. A 1,000-foot-long segment of this new runway will be located over the top of the Enterprise Avenue Landfill (EAL) (see Figure 1), which is on the City of Philadelphia Water Department (PWD) Southwest Water Pollution Control Plant property. The EAL is a deleted United States Environmental Protection Agency (EPA) Superfund site.
机译:费城航空局(DOA)正在建设一条新的5,000英尺长的通勤跑道(8-26号跑道),该跑道位于当前的费城国际机场的东北部。该跑道将提供处理较小型通勤飞机所需的容量,从而缓解机场两条主要的11,000英尺主跑道上的交通拥堵。这条新跑道的1,000英尺长,将位于企业大道垃圾填埋场(EAL)的顶部(见图1),该填埋场位于费城水务局(PWD)西南水污染控制厂所在地。 EAL是已删除的美国环境保护署(EPA)超级基金网站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号