首页> 外文期刊>Engineering news-record >Ironworkers Complete Evergreen Point Bridge Incident Free in Seattle
【24h】

Ironworkers Complete Evergreen Point Bridge Incident Free in Seattle

机译:铁工在西雅图完成常绿点桥事件

获取原文
获取原文并翻译 | 示例
       

摘要

Iron Workers Local 86 (Seattle) with Rebar International, Kiewit (GC), Gerdau and NW Tower Crane worked more than 40,000 man hours and installed almost 17.8 tons of rebar without a recordable or lost-time incident on the Evergreen Point Bridge near Seattle. Ironworkers from Local 86 and their contractors worked with the community to employ local workers on the $1.3-billion project that provided job opportunities for five years during the recession (visit www.ironworkers.org for more information).
机译:与Rebar International,Kiewit(GC),Gerdau和NW Tower Crane合作的Iron 86 Local(西雅图)钢铁工人工作了40,000多个小时,并在西雅图附近的Evergreen Point桥上安装了将近17.8吨的钢筋,而没有发生可记录或丢失时间的事故。来自Local 86的Ironworkers及其承包商与社区合作,为这个耗资13亿美元的项目雇用当地工人,该项目在经济衰退期间提供了五年的就业机会(有关更多信息,请访问www.ironworkers.org)。

著录项

  • 来源
    《Engineering news-record》 |2017年第14期|82-82|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号