Freely forwarded sectioned multi course reinforced concrete bridge - has loads indirectly lowered on completed superstructure and directly on next pier
Freely forwarded sectioned multi course reinforced concrete bridge - has loads indirectly lowered on completed superstructure and directly on next pier
展开▼
机译:自由前进的分段多层钢筋混凝土桥梁-在完成的上部结构上和在下一个墩子上直接降低荷载
展开▼
页面导航
摘要
著录项
相似文献
摘要
The erection process is for multi-course reinforced-concrete bridges in sections freely built out, with forwarded fabricated concrete units and a moving appliance (4) comprising two course-length parallel carriers with travelling cranes on top. The carriers (5) deposit loads indirectly from above onto the completed superstructure (1) via movable transverse carriers; and are hinged lengthways to deliver them directly onto the next pier (3) via an outside support structure. All the superstructure sections on a double cantilever arm can be successively and contrinously moved, with the lengthways carriers maintaining a stationary position, and holding the superstructure so that it can be centrally mounted on the pier and freely rotatable about every axis.
展开▼