首页> 外文期刊>Engineering news-record >Ammunitipn For Skeptics
【24h】

Ammunitipn For Skeptics

机译:怀疑论者的弹药

获取原文
获取原文并翻译 | 示例
       

摘要

In recent weeks, President Trump has let it be known that he no longer foresees public-private partnerships as the centerpiece of his infrastructure plan. No surprise there. The president will look for "shovel-ready" projects and understands that P3s are complicated and don't always work. But a few days later, we learned that another Australian P3 gone bad is headed for court-the second or third troubled P3 in that country, depending how you count (ENR10/23 p. 10). There is a link between these two apparently separate events in Washington, D.C., and Brisbane: flawed traffic-flow forecasts, which have doomed several P3 projects around the world and soured the atmosphere surrounding transportation P3s, especially in the U.S. The issue has a long history. In 2006, The Denver Post reviewed 23 toll roads built since 1985 and found that five of them "sold bonds based on projections prepared by companies promised or granted future business after their projects made sense to investors." Summing up the views of the experts and critics cited in the article, the Post writer said, "The arrangements raise questions about the objectivity of the traffic and revenue study."
机译:最近几周,特朗普总统宣布他不再将公私伙伴关系作为其基础设施计划的核心。毫不奇怪。总裁将寻找“准备就绪”的项目,并了解P3十分复杂且并不总是有效。但是几天后,我们得知又有一个澳大利亚P3变质了,即将上法庭-该国第二或第三个陷入困境的P3,具体取决于您的计算方式(ENR10 / 23 p。10)。在华盛顿特区和布里斯班这两个看似独立的事件之间存在联系:交通流量预测存在缺陷,这注定了世界各地的多个P3项目,并污染了交通P3周围的气氛,尤其是在美国。问题长期存在历史。 2006年,《丹佛邮报》对自1985年以来修建的23条收费公路进行了审查,发现其中有5条“根据公司对项目有意义的承诺或授予未来业务的公司准备的预测出售债券”。总结这篇文章中引用的专家和评论家的观点,《邮报》的作者说:“这些安排引起了有关流量和收入研究的客观性的疑问。”

著录项

  • 来源
    《Engineering news-record》 |2017年第13期|68-68|共1页
  • 作者

    Richard Korman;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号