首页> 外文期刊>Engineering news-record >Team Takes on Daring Job, Embraces Risks
【24h】

Team Takes on Daring Job, Embraces Risks

机译:团队勇于承担风险

获取原文
获取原文并翻译 | 示例
       

摘要

It was a risky job, subject to myriad variables, the least of which was the fickle currents of New York City's tidal East River. It was a pioneering job that took modular construction to new levels. It was a nerve-racking job executed in the dark, which caused many a sleepless night It was a successful job that saved time and money. It was the logistical feat of delivering (by river) and lifting (with a derrick barge) 19 heavy modules for a laboratory building at Rockefeller University.
机译:受多种因素影响,这是一项冒险的工作,其中最少的是纽约市潮汐东河的多变潮流。这是一项开创性的工作,将模块化构造提升到了新的水平。这是在黑暗中执行的令人费解的工作,这导致许多不眠之夜。这项成功的工作节省了时间和金钱。这是为洛克菲勒大学的一所实验室建造的(按河流)运输和吊运(用井架驳船)19个重型模块的后勤壮举。

著录项

  • 来源
    《Engineering news-record》 |2017年第9期|68-68|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:39

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号