TIC in April 2016 completed Elk Station 2 & 3 for Golden Spread Electric Cooperative, near Abernathy, Texas. Work included design and construction of two 380-MW, simple-cycle power plants that use two General Electric 7FA.05 combustion turbines with a grid-switching switchyard. It supplies power to both the Southwest Power Pool (SPP) and the Electric Reliability Council of Texas (ERCOT). The team designed two independent units that can generate power to both the SPP and ERCOT grids, which required an elaborate protection scheme and redundant, hard-wired interlocks to ensure the North American Electric Reliability Corp. (NERC) interconnections remained separate at all times.
机译:TIC于2016年4月在得克萨斯州阿伯纳西附近为Golden Spread Electric Cooperative完成了Elk Station 2和3。工作包括设计和建造两个380兆瓦的简单循环发电厂,这些发电厂使用了两个带有电网切换开关站的通用电气7FA.05燃气轮机。它为西南电力池(SPP)和德克萨斯电力可靠性委员会(ERCOT)供电。该团队设计了两个独立的单元,可以同时为SPP和ERCOT电网供电,这需要精心设计的保护方案和冗余的硬接线联锁装置,以确保北美电力可靠性公司(NERC)的互连始终保持独立。

著录项

  • 来源
    《Engineering news-record》 |2017年第7期|30-30|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:43

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号