首页> 外文期刊>Engineering news-record >EXPERT CROSSED POND TO FINISH FIRST US OFFSHORE WIND FARM
【24h】

EXPERT CROSSED POND TO FINISH FIRST US OFFSHORE WIND FARM

机译:专家越过池塘完成美国第一场海上风电场

获取原文
获取原文并翻译 | 示例
       

摘要

For Deepwater Wind, small was definitely better. The developer has carved a new niche for alternative energy in the U.S. with the successful completion last year of the five-turbine, 30-MW Block Island wind farm off the Rhode Island coast-the first such offshore project to begin commercial operation in American waters. Leading the $300-million construction effort involving an array of contractors was company President Chris Van Beek, a Dutch native who joined Deepwater Wind after a 25-year career in offshore oil-and-gas construction at Netherlands-based Heerema Marine Contractors. With no ready supply chain in the U.S. to serve the project, Van Beek says he "had to get creative," leaning on connections from oil-and-gas work in Europe and Mexico. He says construction participants also overcame the "learning curve" of working in unpredictable ocean waters, says Van Beek. He says the project, built over two years to accommodate coastal Rhode Island's rough weather, was completed on budget and schedule, with no contractor claims.
机译:对于深水风来说,小绝对是更好的选择。开发商去年在罗德岛沿岸成功建造了五台涡轮机,30兆瓦的布洛克岛风电场,在美国替代能源领域开辟了新的利基市场。这是第一个在美国水域开始商业运营的此类海上项目。公司总裁克里斯·范·比克(Chris Van Beek)领导着涉及多家承包商的3亿美元建筑工程,他是荷兰裔人,在总部位于荷兰的Heerema Marine Contractors从事海上油气建设25年之后,他加入了Deepwater Wind。 Van Beek说,由于美国没有现成的供应链来为该项目服务,他“必须要有创造力”,而只能依靠欧洲和墨西哥的油气工作之间的联系。他说,建筑业参与者也克服了在不可预测的海水中工作的“学习曲线”,范贝克说。他说,为适应罗得岛州沿海的恶劣天气而建造的该项目历时两年,已按预算和进度完成,没有承包商要求。

著录项

  • 来源
    《Engineering news-record》 |2017年第2期|40-40|共1页
  • 作者

    Debra K. Rubin;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号