首页> 外文期刊>Engineering news-record >After Bottom-Line Hits, More Firms Exit Fixed-Price Projects
【24h】

After Bottom-Line Hits, More Firms Exit Fixed-Price Projects

机译:在底线点击后,更多公司退出固定价格项目

获取原文
获取原文并翻译 | 示例
       

摘要

Three large, publicly held contractors-SNC-Lavalin Group Inc., Fluor Corp. and Granite Construction Inc.-are exiting fixed-price contracting as a business-growth strategy in the wake of megaproject risk imbalance, the companies said in disclosing their second quarter results. After announcing a $1.6-billion quarter loss on Aug. 1, Canada design-builder SNC-Lavalin said it will not bid on future "lump-sum turnkey" projects and will reorganize its infrastructure, oil-and-gas and mining units into separate businesses. That compares to $62.7-million profit a year earlier. Fixed-price contracts are the "root cause ... of performance issues," said interim CEO Ian Edwards. "The current model within our industry is broken."
机译:三个大型公开持有的承包商-Snc-Lavalin Group Inc.,Fluor Corp.和Granite建筑Inc.-在Megaproject风险不平衡之后退出固定价格作为业务增长战略,这些公司表示在披露其第二次季度结果。在8月1日宣布16亿美元的亏损后,加拿大设计 - 建造者SnC-Lavalin表示,它不会投标未来的“连任交钥匙”项目,并将重组其基础设施,油气和采矿单位分开企业。这比同时比较了6270万美元的利润。固定价格合约是“绩效问题的根本原因”,临时首席执行官Ian Edwards表示。 “我们行业内的当前模型被打破了。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号