首页> 外文期刊>Engineering news-record >Slide Rail System Used for Storm Drain Upgrades
【24h】

Slide Rail System Used for Storm Drain Upgrades

机译:滑轨系统用于雨水排放升级

获取原文
获取原文并翻译 | 示例
       

摘要

A Denver contractor installed a new storm drainage system that will improve water runoff control in the area. The project required a linear run of 108 ft, a width of 20 ft and a depth of 24 ft. The competent person onsite classified the sandy soil as type C. The project site was located 12 ft from an existing road and 1 ft from an active electrical box. The contractor required an open-span large area for the installation of a 12- x 14-ft box culvert. Additionally, the contractor needed to install 50 ft of 108-in. pipe by microtunneling. The excavation cut would require a system that would secure the adjacent structures and provide proper support and sufficient clearance.
机译:丹佛承包商安装了新的雨水排放系统,该系统将改善该地区的径流控制。该项目要求直线行驶108英尺,宽度为20英尺,深度为24英尺。现场合格人员将砂土分类为C型。项目所在地位于距现有公路12英尺,距公路1英尺的位置。有源电箱。承包商需要一个大跨度的大面积来安装12 x 14英尺的箱形涵洞。此外,承包商需要安装50英尺的108英寸。通过微隧道管。开挖切口将需要一个能够固定相邻结构并提供适当支撑和足够间隙的系统。

著录项

  • 来源
    《Engineering news-record》 |2018年第17期|42-42|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:34:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号