首页> 外文期刊>Engineering news-record >Methuen Moves on Mandates
【24h】

Methuen Moves on Mandates

机译:梅修恩执行任务

获取原文
获取原文并翻译 | 示例
       

摘要

Methuen Construction, which debuts on the Top 200 at No. 103, is used to tackling upgrades of aging New England water and waste-water facilities so owners can meet new supply and treatment demands and avoid federal penalties. But its work on the $74-million Peirce Island sewage treatment plant revamp in Portsmouth, N.H., had an added dimension. That city's largest public works project was on a Revolutionary War-era fortification site that challenged the firm to install modern technology and larger capacity (see above) on an island site with limited access and adjacent historic preservation under way. Ahead for Methuen is a $51-million Pittsfield, Mass., wastewater plant upgrade required to meet EPA nutrient discharge mandates for the at-risk Housatonic River. Methuen Executive Vice President Wayne Symonds says its environmental market is "stable," but adds "states and communities just don't have the resources to undertake large projects alone." Methuen aims to expand beyond New England as part of a 10-year plan to more than double its current $120-million total revenue.
机译:Methuen Construction排名前200位,排名第103位,用于应对新英格兰老化的供水和废水处理设施的升级,以便业主能够满足新的供水和处理要求,并避免受到联邦罚款。但其在新泽西州朴次茅斯耗资7400万美元的皮尔士岛污水处理厂改造项目中却增加了规模。那个城市最大的公共工程项目是在革命战争时期的设防工地上,该公司向该公司提出挑战,要求该公司在一个通行受限且正在进行历史保护的岛屿工地上安装现代技术和更大的能力(见上文)。迈索恩市的前身是马萨诸塞州匹兹菲尔德市耗资5,100万美元的污水处理厂升级项目,以满足危险中的胡萨托尼克河的EPA营养排放要求。 Methuen执行副总裁Wayne Symonds表示,其环境市场“稳定”,但补充道,“各州和社区根本没有资源独自承担大型项目。” Methuen的目标是将其扩展到新英格兰以外的地区十年计划将目前的总收入1.2亿美元增加一倍以上。

著录项

  • 来源
    《Engineering news-record》 |2019年第3期|51-51|共1页
  • 作者

    Jim Parsons;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:29:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号