Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management

机译:使用相位精益管理在建筑项目中整合生产和勃起预制作钢框架的安装过程

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Purpose The purpose of this paper is to investigate the effects of implementing value stream mapping (VSM), just in time (JIT), continuous flow and total productive maintenance (TPM) methods throughout production and erection processes of pre-fabricated steel frames (PSFs) of building projects. Design/methodology/approach As phased lean management, after implementing the VSM technique, the JIT technique is implemented as first lean phase and the TPM and the continuous flow techniques are implemented as second lean phase. To evaluate the expected improvement of project performance due to reduce wastes by implementing lean techniques, discrete event simulation (DES) is utilized. In this research, an eight-story residential building project in Tehran, Iran, is studied. Findings Simultaneous use of lean techniques to integrate production and erection processes of PSFs leads to the improvement of the performance of production and erection stages, significantly. The results indicate 43 and 17 percent reduction in PSFs production and erection processes time and cost, respectively. Research limitations/implications - In the present study, only the effects of implementing lean techniques on the production and erection of PSFs have been evaluated. However, it is also possible to apply these lean approaches and the key strategies to the other modular or pre-fabricated construction methods. Originality/value The main contribution to knowledge is improving the construction project performance by integrating the production and erection processes, using phased lean management through implementing lean techniques. The results of the current study provide valuable insight into the possibility of integrating and improving construction processes of pre-fabricated construction.
机译:目的本文的目的是探讨实施价值流映射(VSM),正常(JIT),连续流量和总生产性维护(TPM)方法的影响,在整个生产和勃起的钢框架的生产和安装过程中(PSFS )建筑项目。设计/方法/方法作为相位精益管理,在实现VSM技术之后,JIT技术实现为第一瘦阶段,TPM和连续流动技术被实现为第二瘦阶段。为了评估通过实施瘦技术来减少废物的预期改善项目性能,使用离散事件模拟(DES)。在这项研究中,研究了伊朗德黑兰的八层住宅建筑项目。调查结果同时使用精益技术来集成PSF的生产和安装过程,从而提高生产和勃起的性能,显着提高了生产和勃起的性能。结果表明,PSFS生产和勃起处理时间和成本分别降低了43%和17%。研究局限性/影响 - 在本研究中,仅评估了在PSF的生产和勃起上实施精益技术的影响。然而,也可以将这些瘦方法和适用于其他模块化或预先制造的施工方法的关键策略应用。创意/价值通过整合生产和勃起管理,通过实现精益技术来通过实现精益管理来改善建设项目性能。目前研究的结果提供了有价值的见解,以实现整合和改进预制结构的施工过程的可能性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号