首页> 外文期刊>Energy >Parabolic antenna snow melting and removal using waste heat from the transmitter room
【24h】

Parabolic antenna snow melting and removal using waste heat from the transmitter room

机译:抛物面天线积雪融化并利用发射机室的余热进行清除

获取原文
获取原文并翻译 | 示例
           

摘要

This study simulated snow melting and removal using hot waste heat air generated in a transmitter room which was used to melt and remove snow from a satellite antenna. The air was supplied at 30 degrees C and 20 m/s and removed the 10 mm thick snow cover within 17.6 min with the snowmelt consuming 135 WI m(2) with an average melting rate of 0.57 min/min. The heat dissipation from the waste heat air to melt snow could be on the order of 25.7-51.38 kW for wind speeds of 10-20 m/s. Thus, this waste heat snow melting system can reduce the power consumption by 32.0-50.8 kW compared with the conventional electric de-icing equipment which would reduce the power consumption by 68.1-91.0%, while also reducing the air conditioning power consumption by 2.9-5.8%. (C) 2019 Elsevier Ltd. All rights reserved.
机译:这项研究使用发射室产生的热废热模拟融雪和清除积雪,该融雪用于从卫星天线融化和清除积雪。以30摄氏度和20 m / s的速度供应空气,并在17.6分钟内除去10 mm厚的积雪,融雪消耗135 WI m(2),平均融化速度为0.57 min / min。对于风速为10-20 m / s的情况,从废热空气到融雪的散热量约为25.7-51.38 kW。因此,与传统的除冰设备相比,该废热融雪系统可将能耗降低32.0-50.8 kW,从而可将能耗降低68.1-91.0%,同时还将空调能耗降低2.9- 5.8%。 (C)2019 Elsevier Ltd.保留所有权利。

著录项

  • 来源
    《Energy》 |2019年第15期|738-744|共7页
  • 作者单位

    Beijing Univ Civil Engn & Architecture, Sch Energy & Environm Engn, Beijing 100044, Peoples R China;

    Zhongke Energy Conservat & Technol Co, Beijing 100081, Peoples R China;

    Beijing Univ Civil Engn & Architecture, Sch Energy & Environm Engn, Beijing 100044, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Antenna snow removal; Waste heat recycling; Data center; Energy conservation;

    机译:天线除雪;余热回收;数据中心;节能;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号