首页> 外文期刊>Energy and Environment Research >Risk Evaluation of Bidding for Wind Farm Construction Project
【24h】

Risk Evaluation of Bidding for Wind Farm Construction Project

机译:风电场建设项目招标风险评估

获取原文
获取原文并翻译 | 示例
           

摘要

With the rapid development and growth of the installed capacity of wind power generation in China, more and more attention has been paid to the risk of wind farm construction projects. Based on the extension element method and the multi-level fuzzy comprehensive evaluation method, this paper makes an empirical analysis on the bidding risk of the wind farm construction project of Xintiandi energy company in Hebei province. The research shows that the extensible matter element method can provide effective support for decision makers because there are no different evaluation principles and more accurate risk evaluation.
机译:随着中国风力发电装机容量的快速发展和增长,风电场建设项目的风险越来越受到关注。基于可拓元法和多层次模糊综合评价法,对河北省新天地能源公司风电场建设项目投标风险进行了实证分析。研究表明,由于没有不同的评估原则和更准确的风险评估方法,可扩展物元法可以为决策者提供有效的支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号