Comprehensive performance audit of a utility

机译:公用事业的全面绩效审计

获取原文
获取原文并翻译 | 示例
           

摘要

As part of its efforts to ensure that the utilities are taking all reasonable measures to maintain optimum performance of their power plants, the New York State Department of Public Service (DPS) initiated power-plant performance audits of the seven utilities in the state. All audit of the Long Island Lighting Company (LILCO) was performed, and the results are discussed. The objective of the audit was to make a comprehensive study of the power-plant operations and programs relating to the performance of the generating units and to identify areas of potential improvement. The assessment of performance covered 10 fossil units totaling about 2500 MW with an average age of over 25 years. The audit was carried out over the period of January 1987 through August 1988. The process involved an examination of plant equipment design and operational data, interviews with plant. head office. engineering and training personnel, and site inspections. Computer modeling was used to identify heat rate losses, which are then subjected to root cause analyses with remedial measures evaluated in terms of costs and benefits. Operating practices, fuel purchasing, water chemistry, and maintenance and performance improvement projects were also examined.
机译:为了确保公用事业公司采取一切合理措施以保持其发电厂的最佳性能,纽约州公共服务部(DPS)对该州的七家公用事业公司进行了发电厂性能审计。对长岛照明公司(LILCO)进行了所有审核,并对结果进行了讨论。审核的目的是对与发电机组性能相关的电厂运行和程序进行全面研究,并确定潜在的改进领域。性能评估涵盖了10个化石单元,总计约2500 MW,平均年龄超过25年。审核是在1987年1月到1988年8月之间进行的。该过程涉及对工厂设备设计和操作数据的检查以及对工厂的采访。总公司。工程和培训人员以及现场检查。使用计算机建模来确定热量损失,然后对热量损失进行根本原因分析,并根据成本和收益对补救措施进行评估。还检查了操作方法,燃料购买,水化学以及维护和性能改进项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号