A new ice-storage experimental system with a closed (CIST) and an open (OIST) ice-storage tank has been exploited, with which the external ice melting processes are studied experimentally. Furthermore, the researches on combinations of external and internal ice melting have been carried out. The experiments indicate that the cold release rate of CIST is more stable than that of OIST under the same conditions, especially, the cold release rate of OIST decreases significantly at the later stage of the discharging process. The outlet temperature of the discharge water flowing from the bottom-to-top (Mode 1) is lower than that from the top-to-bottom of the ice-storage tank (Mode 2). With the relatively lower volumetric-flow rate, the outlet temperatures of the discharge water rise slowly, meanwhile, the cold release rate is also relatively lower. To solve the problem of "millennial ice" in the external system without an air-agitation device, two types of the combination of external and internal ice melting have been adopted, one is to adopt internal ice melting at first, and then external ice melting, the other is to adopt simultaneously the internal and external ice melting. The experiments show that the cumulative discharging capacity of the latter has been significantly improved. (C) 2019 Elsevier B.V. All rights reserved.
机译:已经利用了一种具有封闭(CIST)和开放(OIST)冰储罐的新型冰储物实验系统,并在实验中研究了外部冰熔过程。此外,已经进行了对外部和内部冰熔化的组合的研究。实验表明,在相同的条件下,CIS的冷释放速率比OIST更稳定,特别是,OIST的冷释放速率在放电过程的后期阶段显着降低。从底顶(模式1)流动的排出水的出口温度低于冰储罐(模式2)的顶到底部的出口温度。具有相对较低的体积流速,排出水的出口温度缓慢地升高,同时冷释放速率也相对较低。为了解决外部系统中的“千禧年”问题而没有空气搅拌装置,已经采用了两种类型的外部和内部冰熔化的组合,一是首先采用内部冰熔化,然后采用外部冰熔化,另一个是同时采用内部和外部冰熔化。实验表明,后者的累积排放能力已显着改善。 (c)2019 Elsevier B.v.保留所有权利。

著录项

  • 来源
    《Energy and Buildings》 |2019年第7期|12-20|共9页
  • 作者单位

    Beijing Univ Technol Inst Civil & Architectural Engn Beijing 100124 Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff Beijing 100124 Peoples R China;

    Beijing Univ Technol Inst Civil & Architectural Engn Beijing 100124 Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff Beijing 100124 Peoples R China;

    Beijing Univ Technol Inst Civil & Architectural Engn Beijing 100124 Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff Beijing 100124 Peoples R China;

    Beijing Univ Technol Inst Civil & Architectural Engn Beijing 100124 Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff Beijing 100124 Peoples R China;

    Beijing Univ Technol Inst Civil & Architectural Engn Beijing 100124 Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff Beijing 100124 Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Closed ice-storage tank (CIST); Open ice-storage tank (OIST); Combination of the internal and external ice melting; The cold release rate; The cumulative discharging capacity; Millennial ice;

    机译:封闭的冰储罐(成本);打开冰柜罐(清单);结合内部和外部冰熔化;冷释率;累积卸料能力;千禧年冰;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号