首页> 外文期刊>Energy and Buildings >Experimental investigation of ice melting system with open and closed ice-storage tanks combined internal and external ice melting processes
【24h】

Experimental investigation of ice melting system with open and closed ice-storage tanks combined internal and external ice melting processes

机译:带有内外融冰过程的开放式和封闭式储冰箱的融冰系统的实验研究

获取原文
获取原文并翻译 | 示例
       

摘要

A new ice-storage experimental system with a closed (CIST) and an open (OIST) ice-storage tank has been exploited, with which the external ice melting processes are studied experimentally. Furthermore, the researches on combinations of external and internal ice melting have been carried out. The experiments indicate that the cold release rate of CIST is more stable than that of OIST under the same conditions, especially, the cold release rate of OIST decreases significantly at the later stage of the discharging process. The outlet temperature of the discharge water flowing from the bottom-to-top (Mode 1) is lower than that from the top-to-bottom of the ice-storage tank (Mode 2). With the relatively lower volumetric-flow rate, the outlet temperatures of the discharge water rise slowly, meanwhile, the cold release rate is also relatively lower. To solve the problem of "millennial ice" in the external system without an air-agitation device, two types of the combination of external and internal ice melting have been adopted, one is to adopt internal ice melting at first, and then external ice melting, the other is to adopt simultaneously the internal and external ice melting. The experiments show that the cumulative discharging capacity of the latter has been significantly improved. (C) 2019 Elsevier B.V. All rights reserved.
机译:开发了一种新的具有封闭式(CIST)和开放式(OIST)储冰罐的储冰实验系统,并通过该实验系统对外部冰的融化过程进行了实验研究。此外,已经进行了关于外部和内部冰融化的组合的研究。实验表明,在相同条件下,CIST的冷释放速率比OIST稳定,特别是在放电后期,OIST的冷释放速率明显降低。从底部到顶部(模式1)的排放水的出口温度低于从储冰罐(模式2)的顶部到底部的排放温度。在相对较低的体积流量的情况下,排出水的出口温度缓慢升高,同时冷释放速率也相对较低。为了解决没有空气搅拌装置的外部系统中的“千年冰”问题,采用了内部和内部融冰两种结合方式,一种是首先内部融化,然后是外部融化。融冰,另一种是同时采用内部和外部融冰。实验表明,后者的累积放电容量已有明显提高。 (C)2019 Elsevier B.V.保留所有权利。

著录项

  • 来源
    《Energy and Buildings》 |2019年第7期|12-20|共9页
  • 作者单位

    Beijing Univ Technol, Inst Civil & Architectural Engn, Beijing 100124, Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff, Beijing 100124, Peoples R China;

    Beijing Univ Technol, Inst Civil & Architectural Engn, Beijing 100124, Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff, Beijing 100124, Peoples R China;

    Beijing Univ Technol, Inst Civil & Architectural Engn, Beijing 100124, Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff, Beijing 100124, Peoples R China;

    Beijing Univ Technol, Inst Civil & Architectural Engn, Beijing 100124, Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff, Beijing 100124, Peoples R China;

    Beijing Univ Technol, Inst Civil & Architectural Engn, Beijing 100124, Peoples R China|Beijing Key Lab Green Built Environm & Energy Eff, Beijing 100124, Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Closed ice-storage tank (CIST); Open ice-storage tank (OIST); Combination of the internal and external ice melting; The cold release rate; The cumulative discharging capacity; Millennial ice;

    机译:封闭式储冰罐(COST);开放式储冰罐(LIST);内部和外部融冰的组合;冷释放率;累积排放量;千年冰;
  • 入库时间 2022-08-18 04:22:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号