...
首页> 外文期刊>Electrical India >Reliance launches greenfield power project in Haryana
【24h】

Reliance launches greenfield power project in Haryana

机译:Reliance在哈里亚纳邦启动绿地电力项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The first phase of the greenfield power project set up by Reliance Energy in Haryana was inaugurated Thursday by Haryana Chief Minister Bhupinder Singh Hooda. The first phase of the 600-megawatt Deen Bandhu Chhotu Ram Thermal Power Project was completed in a record time of 27-months. In the first phase it will generate about 300-mw electricity. The commissioning of the first phase also coincided with the day when the Haryana state was created nearly four decades ago, Nov 1,1966. The project will be one of the lowest cost power projects in the country, maintaining highest standards of quality.
机译:哈里亚纳邦首席部长普林德·辛格·胡达(Bhupinder Singh Hooda)周四宣布,由Reliance Energy在哈里亚纳邦建立的绿地电力项目的第一阶段开幕。 600兆瓦的Deen Bandhu Chhotu Ram热电项目的第一阶段在创纪录的27个月内完成。在第一阶段,它将产生约300兆瓦的电力。第一阶段的调试也恰逢1966年11月1日(即大约40年前)建立哈里亚纳邦的那一天。该项目将是该国成本最低的电力项目之一,保持最高的质量标准。

著录项

  • 来源
    《Electrical India》 |2007年第11期|p.38|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号