Adaptive Scheme for Minimal Load Shedding Utilizing Synchrophasor Measurements to Ensure Frequency and Voltage Stability

机译:利用同步相量测量确保频率和电压稳定度的最小减载自适应方案

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This article presents a new scheme for load curtailment in the power system under critical contingencies that may pose a threat to the frequency and voltage stability of the system. The proposed scheme is based on a two-stage loadshedding strategy. In the first stage, disturbances have been classified based on the computed value of the disturbance power, and the load-shedding requirement in the system has been assessed based on the frequency stability, as well as dynamic voltage stability, conditions. The scheme assumes the availability of real-time data from a synchrophasor-based wide area monitoring and control system. A dynamic voltage stability criterion has been developed in this stage using a voltage stability risk index to assess the voltage stability in real time. Suitable locations for the load curtailments have been chosen according to the voltage stability risk index, which is calculated at each load bus. After the system attains transient stability, the second stage of the proposed scheme determines the optimal redispatching of generators for recovering the loads as much as possible, which had been curtailed in the first stage following the contingency. Performance of the proposed scheme has been tested on a 10-machine, New England 39-bus system, and the results are compared with a conventional under-frequency load-shedding scheme and an adaptive load-shedding scheme.
机译:本文提出了一种在紧急情况下削减电力系统负载的新方案,该方案可能会对系统的频率和电压稳定性造成威胁。所提出的方案基于两阶段的负荷削减策略。在第一阶段,根据干扰功率的计算值对干扰进行分类,并根据频率稳定性以及动态电压稳定性条件评估系统中的负载降低要求。该方案假定可从基于同步相量的广域监视和控制系统获得实时数据。在这一阶段,已经开发出了动态电压稳定性标准,该标准使用电压稳定性风险指数来实时评估电压稳定性。根据电压稳定性风险指数选择了减少负载的合适位置,该指数是在每个负载母线上计算的。系统达到暂态稳定之后,建议方案的第二阶段将确定发电机的最佳重新分配,以尽可能多地恢复负载,在应急之后的第一阶段已将其削减。该方案的性能已经在10台机器上,新英格兰39总线系统上进行了测试,并将结果与​​常规的低频减载方案和自适应减载方案进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号