首页> 外文期刊>Electric light & power >Public Policy Considerations in Transmission Planning
【24h】

Public Policy Considerations in Transmission Planning

机译:输电规划中的公共政策考虑

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Transmission planning is changing. In response to evolving public expectations for the U.S. electricity system, regulators are requiring that considerations in- eluding public policy goals be included in regional planning ef-forts.Accounting for the full range of affirmative obligations, which include safeguarding reliability, reducing carbon emissions, keeping costs reasonable, facilitating clean generation technologies and avoiding unneces- sary impacts on the landscape, will be critical. There is much work to do, especially when ac-counting for sensitive wildlife and ecological concerns for which there are statutory protec-tions.
机译:传输计划正在改变。为了响应公众对美国电力系统不断发展的期望,监管机构要求将包括公共政策目标在内的考虑因素纳入区域规划工作中。应对包括权利保护,可靠性,减少碳排放,保持成本合理,促进清洁发电技术并避免对景观造成不必要的影响至关重要。有许多工作要做,特别是在考虑到有法定保护措施的敏感野生动植物和生态问题时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号