Koolau-Pukele structures replacement project

机译:Koolau-Pukele结构更换项目

获取原文
获取原文并翻译 | 示例

摘要

One of the key substations on Hawaiian Electric Co.'s (HECO) grid in Oahu is the Pukele Substation. This substation services approximately 18 percent of the total load on the island, including the key business and vacation area of Waikiki and the densely populated area of east Oahu. The Pukele Substation is serviced by two parallel 138kV transmission lines*the Koolau-Pukele 138kV #1 line and the Koolau-Pukele 138kV #2 line. The two most critical structures on these lines are located on the top of the ridge: structure #9 on the Koolau-Pukele 138kV #1 line and structure #2 on the Koolau-Pukele 138kV line #2. The cumulative effects of both normal and severe weather in their 40-plus years of service caused some deterioration of the strength carrying capabilities of these aluminum lattice towers. An inspection of structures #2 and #9 in 1998 revealed that both were showing signs of distress. As a result of this inspection, and because of the importance of these two lines, a tower replacement program was quickly initiated. Since these two lines are the only two lines servicing the Pukele substation, one line would have to remain in service at all times.
机译:夏威夷瓦胡岛电力公司(HECO)在瓦胡岛的主要变电站之一是Pukele变电站。该变电站服务于该岛上约18%的总负荷,包括威基基(Waikiki)的主要商业和度假区以及瓦胡岛东部人口稠密的地区。 Pukele变电站由两条并联的138kV输电线路* Koolau-Pukele 138kV#1线路和Koolau-Pukele 138kV#2线路提供服务。这些线路上的两个最关键的结构位于山脊的顶部:Koolau-Pukele 138kV#1线路上的#9结构和Koolau-Pukele 138kV#2线路上的#2结构。正常和恶劣天气在服务40多年中的累积影响使这些铝格塔的强度承载能力有所下降。 1998年对#2和#9建筑物的检查显示,它们都显示出遇险迹象。检查的结果,并且由于这两条生产线的重要性,塔筒更换程序迅速启动。由于这两条线路是为Pukele变电站提供服务的仅有的两条线路,因此一条线路必须始终保持服务状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号