首页> 外文期刊>District energy >DCO Energy to Build CHCP Project in Atlantic City
【24h】

DCO Energy to Build CHCP Project in Atlantic City

机译:DCO Energy将在大西洋城建设CHCP项目

获取原文
获取原文并翻译 | 示例
       

摘要

DCO Energy LLC has signed an engineering, procurement and construction agreement with ACB Energy Partners to design and construct a combined heating, cooling and power (CHCP) project at the Marina Thermal Facility in Atlantic City, NJ. The CHCP plant will be an addition to the Marina Thermal Facility, which provides heating, cooling and electric services to the Borgata Hotel Casino & Spa and the Water Club. The project will reduce carbon dioxide emissions by 16,000 tons per year - comparable to removing 3,000 cars from the road. The plant will be operational in early 2011. DCO Energy President Frank DiCola said the CHCP project "will break new ground in clean energy for the gaming industry."
机译:DCO Energy LLC已与ACB Energy Partners签署了一项工程,采购和建筑协议,以在新泽西州大西洋城的Marina热力工厂设计和建造热,冷和电联合(CHCP)项目。 CHCP工厂将是Marina热力设施的补充,该设施将为Borgata Hotel Casino&Spa和Water Club提供加热,冷却和电力服务。该项目每年将减少二氧化碳排放量16,000吨-相当于从道路上拆除3000辆汽车。该工厂将于2011年初投入运营。DCO能源总裁Frank DiCola表示,CHCP项目“将为游戏行业开辟清洁能源的新天地”。

著录项

  • 来源
    《District energy》 |2011年第1期|p.53|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:23:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号