An Integration of Project Management Body of Knowledge and Project Management Information System to Improve On-time Deliverable of Liquefied Natural Gas Station Construction Projects

机译:项目管理机构的整合与项目管理信息系统,提高液化天然加油站建设项目的准时可交付

获取原文
           

摘要

The objective of this study is to improve the liquefied natural gas station construction project to achieve on-time delivery. Diverse tools and techniques are integrated to make various interrelated activities in the project occur effectively as planned with less cost, suggested by the Project Management Body of Knowledge (PMBOK) guideline and the Project Management Information System (PMIS). To implement the PMIS along with the PMBOK, the project management software and Internet of Things (IoT) are utilized for real-time long-distance monitoring and control of the project. The proposed approach is implemented at a real demonstration project. The results reveal that the proposed approach is quite effective, which help increase the number of projects completed on schedule from 75% in the last year to 100% this year. Moreover, the implementation of the PMIS also results in substantial reductions in the employment allowance for routine site inspections and the travel expense for round-trip vehicles travelling from the company to the site.
机译:本研究的目的是改善液化天然加油站建设项目,以实现准时交付。各种工具和技术被整合,以使项目中的各种相互关联的活动有效地在计划中有效地突出,由项目管理知识(PMBOK)指南和项目管理信息系统(PMIs)建议。为了实现PMIS以及PMBOK,项目管理软件和物联网(IOT)用于实时长途监控和控制项目。拟议的方法是在实际示范项目中实施的。结果表明,拟议的方法非常有效,这有助于提高上一年的75%完成的项目数量,今年的100%。此外,PMI的实施也会导致常规现场检查的雇佣津贴和从公司前往网站旅行的往返车辆的旅行费用的大量减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号