首页> 外文期刊>PLoS One >Analysis on the hidden cost of prefabricated buildings based on FISM-BN
【24h】

Analysis on the hidden cost of prefabricated buildings based on FISM-BN

机译:基于Fism-BN的预制建筑物隐藏成本分析

获取原文
           

摘要

Facing the pressure of environment, sustainable development is the demand of the current construction industry development. Prefabricated construction technologies has been actively promoted in China. Cost has always been one of the important factors in the development of prefabricated buildings. The hidden cost of prefabricated buildings has a great impact on the total cost of the project, and it exists in the whole process of building construction. In this paper innovatively studies the cost of prefabricated buildings from the perspective of hidden cost. In order to analysis the hidden cost of prefabricated buildings, the influencing factor index system in terms of design, management, technology, policy and environment has been established, which includes 13 factors in total. And the hidden cost analysis model has been proposed based on FISM-BN, this model combines fuzzy interpretive structure model(FISM) with Bayesian network(BN). This model can comprehensively analyze the hidden cost through the combination of qualitative and quantitative methods. And the analysis process is dynamic, not fixed at a certain point in time to analyze the cost. We can get the internal logical relationship among the influencing factors of the hidden cost, and present it in the form of intuitive chart by FISM-BN. Furthermore the model could not only predict the probability of the hidden cost of prefabricated buildings and realize in-time control through causal reasoning, but also predict the posterior probability of other influencing factors through diagnostic reasoning when the hidden cost occurs and find out the key factors that lead to the hidden cost. Then the final influencing factors are determined after one by one check. Finally, the model is demonstrated on the hidden cost analysis of prefabricated buildings the probability of recessive cost is 26%. In the analysis and control of the hidden cost of prefabricated buildings, scientific and effective decision-making and reference opinions are provided for managers.
机译:面对环境压力,可持续发展是当前建筑业发展的需求。在中国积极推动预制施工技术。成本一直是预制建筑物发展中的重要因素之一。预制建筑的隐藏成本对项目的总成本产生了很大影响,并且存在于建筑施工的整个过程中。本文从隐藏成本的角度创新地研究了预制建筑物的成本。为了分析预制建筑物的隐藏成本,已经建立了设计,管理,技术,政策和环境方面的影响因素指标体系,其中包括13个因素。该模型基于Fism-BN提出了隐藏成本分析模型,将模糊解释性结构模型(Fism)与贝叶斯网络(BN)相结合。该模型可以通过定性和定量方法的组合全面分析隐藏的成本。并且分析过程是动态的,而不是在某个时间点固定以分析成本。我们可以在隐藏成本的影响因素之间获得内部逻辑关系,并以直观图表的形式归功于Fism-BN。此外,该模型不仅可以预测预制建筑物的隐藏成本并通过因果推理来实现时间控制的可能性,而且还通过诊断推理来预测其他影响因素的后验概率,当发生隐藏成本并找出关键因素时这导致隐藏的成本。然后,最终影响因素由一次检查后确定。最后,该模型在预制建筑物的隐藏成本分析上证明了隐性成本的可能性是26%。在分析和控制预制建筑物的隐藏成本中,为管理人员提供了科学和有效的决策和参考意见。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号