首页> 外文期刊>E3S Web of Conferences >Influence of Subway Shield Tunnel Construction on Ground Settlement
【24h】

Influence of Subway Shield Tunnel Construction on Ground Settlement

机译:地铁盾构隧道施工对地面沉降的影响

获取原文
       

摘要

Shield construction has the advantages of stable driving speed, saving manpower, and being able to carry out construction in complex strata, which has been more and more widely used. In the process of shield construction, there is a gap between shield body and segment, which is easy to cause ground settlement when the grouting speed cannot keep up. This paper summarizes the common methods to predict the surface settlement, analyzes the causes of the settlement, and lists an engineering case to illustrate the factors affecting the surface settlement. Finally, it comes to the conclusion that the main causes of the surface settlement caused by shield tunnel construction are formation loss and consolidation settlement, and the use of small cutterhead and composite cutterhead can reduce the surface settlement, It provides a reference for the development of shield construction.
机译:屏蔽结构具有稳定的驾驶速度,节省人力,能够在复杂地层开展建筑,这已经越来越广泛地使用。 在屏蔽结构的过程中,屏蔽体和段之间存在间隙,当灌浆速度不能跟上时,易于引起地面沉降。 本文总结了预测表面沉降的常用方法,分析了结算的原因,并列出了工程案例以说明影响表面沉降的因素。 最后,得出结论是,屏蔽隧道施工引起的表面沉降的主要原因是地层损耗和固结沉降,以及使用小型切割机和复合切割机的使用可以减少表面沉降,为开发提供参考 盾构建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号