首页> 外文期刊>Mathematical Problems in Engineering: Theory, Methods and Applications >Determining the Toll and Capacity of a Highway to Be Constructed in Parallel with Subway
【24h】

Determining the Toll and Capacity of a Highway to Be Constructed in Parallel with Subway

机译:确定高速公路的收费和容量与地铁并行构建

获取原文
获取外文期刊封面目录资料

摘要

This paper considers the problem of toll and capacity choice of a new highway with a bottleneck added onto an existing transit network under four ownership/tolling regimes: public fine toll, public flat toll, private fine toll, and private flat toll. Whenever fine toll and flat toll are imposed, in a competitive highway/transit network with constant returns to scale in road construction, an optimally designed and priced privately owned highway would produce positive net benefit justly equal to the total markup with respect to all autocommuters, whereas an optimally designed and priced publicly owned highway would lead to a deficit; that is, the toll revenues are insufficient to cover its all costs. The economic conditions to invest a new road are investigated under different ownership/tolling regimes.
机译:本文考虑了一个新高速公路的收费和能力选择问题,其中包含在四个所有权/收费制度下的现有过境网络上的瓶颈:公共罚款,公共罚球,私人罚款和私人平板收费。 每当施加巨额收费和扁平损失,在竞争性的公路/运输网络中,在道路建设中不断恢复,最佳设计和价格的私人拥有公路将产生正常的净利润,依赖于所有自动化者的总标记, 而最佳设计和价格的公共公路会导致赤字; 也就是说,收费收入不足以涵盖其所有成本。 在不同的所有权/收费制度下调查投资新道路的经济条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号