首页> 外文期刊>E3S Web of Conferences >Feasibility study on adjustment of injection-production system in extremely high water cut period
【24h】

Feasibility study on adjustment of injection-production system in extremely high water cut period

机译:极高水切割期注射生产系统调整的可行性研究

获取原文
           

摘要

Entering the stage of ultra-high water cut development, affected by faults and irregular well patterns in some areas, there are problems in the development of oilfields such as imperfect injection-production systems, high oil-water wells ratio, low multi-directional connectivity ratio, and complex injection-production relationships. To this end, combined with well seismic and fine reservoir research results, the feasibility study of the injection-production system adjustment was carried out, based on the fine adjustment of the strata well pattern, and through new drilling, supplementary drilling, re-injection, re-production, etc. The well pattern connection rules are conducive to the purpose of adjustment, thereby increasing the recovery rate and improving the effect of oilfield development.
机译:进入超高水路开发的阶段,受到某些领域的故障和不规则井模式的影响,在油田的开发中存在问题,如不完善的注塑系统,高油水井比,低多方向连接 比例和复杂的注射生产关系。 为此,结合良好的地震和精细的水库研究成果,基于地层井图案的微调,通过新钻孔,辅助,重新注塑进行了注塑生产系统调整的可行性研究。 ,重新生产等。井图案连接规则有利于调整的目的,从而提高了恢复率和提高油田开发的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号