...
首页> 外文期刊>E3S Web of Conferences >Improved Genetic Algorithm Integrated with Scheduling Rules for Flexible Job Shop Scheduling Problems
【24h】

Improved Genetic Algorithm Integrated with Scheduling Rules for Flexible Job Shop Scheduling Problems

机译:改进了与灵活作业商店调度问题的调度规则集成的遗传算法

获取原文
           

摘要

This paper presents optimization of makespan for Flexible Job Shop Scheduling Problems (FJSSP) using an Improved Genetic Algorithm integrated with Rules (IGAR). Machine assignment is done by Genetic Algorithm (GA) and operation selection is done using priority rules. Improvements in GA include a new technique of adaptive probabilities and a new forced mutation technique that positively ensures the generation of new chromosome. The scheduling part also proposed an improved scheduling rule in addition to four standard rules. The algorithm is tested against two well-known benchmark data set and results are compared with various algorithms. Comparison shows that IGAR finds known global optima in most of the cases and produces improved results as compared to other algorithms.
机译:本文介绍了使用与规则(IAGR)集成的改进的遗传算法进行了灵活的作业商店调度问题(FJSSP)的Mepespan优化。 机器分配是通过遗传算法(GA)完成的,并且使用优先级规则完成操作选择。 GA的改进包括一种新的自适应概率技术和新的强制突变技术,积极地确保新染色体的产生。 除了四个标准规则之外,调度部分还提出了一种改进的调度规则。 该算法针对两个公知的基准数据集进行测试,并将结果与各种算法进行比较。 比较表明,Igar在大多数情况下发现了全局最佳擎天,并与其他算法相比产生改进的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号