首页> 外文期刊>Procedia Computer Science >Risk identification and assessment with the fuzzy DEMATEL-ANP method in oil and gas projects under uncertainty
【24h】

Risk identification and assessment with the fuzzy DEMATEL-ANP method in oil and gas projects under uncertainty

机译:风险鉴定与评估,在不确定性下石油和天然气工程中的模糊Dematel-ANP方法

获取原文
           

摘要

Oil and gas projects are integrated with a huge number of uncertainties due to their unique characteristics, complexities and uncertain environment. The aim of this study is to identify and evaluate the main risks of this type of projects based on the PMBOK guide under sanctions and uncertain conditions. The main risks were identified through document analysis which were finally reduced to 17 risks through expert judgments using fuzzy Delphi method. The experts included 15 people with more than ten years’ practical experience in the oil and gas projects. The results of confirmatory factor analysis confirmed all risks in terms of statistical population. Then, the interrelations between risks and their importance weights were determined by using hybrid fuzzy DEMATEL-ANP technique. The final results showed that political and economic sanctions have the highest weight, followed by the attraction of foreign investors and the lack of regional infrastructure.
机译:由于其独特的特征,复杂性和不确定的环境,石油和天然气项目集成了大量的不确定性。本研究的目的是根据制裁和不确定条件,根据PMBOK指南识别和评估此类项目的主要风险。通过使用模糊Delphi方法的专家判断,通过文件分析确定了主要风险。专家包括十多年的石油和天然气项目有15多年的实践经验。确认因素分析结果证实了统计人群方面的所有风险。然后,利用混合模糊Dematel-ANP技术确定风险与重要重量之间的相互关系。最终结果表明,政治和经济制裁具有最高重量,其次是外国投资者的吸引力以及缺乏区域基础设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号