...
首页> 外文期刊>Mathematical Problems in Engineering: Theory, Methods and Applications >Evaluation of Ground Surface Pregrouting in a Mountain Tunnel Based on FAHP
【24h】

Evaluation of Ground Surface Pregrouting in a Mountain Tunnel Based on FAHP

机译:基于FAHP的山地隧道地面预测评价

获取原文
           

摘要

The quality of ground surface pregrouting (GSPG) is commonly qualitatively evaluated using single factor; however, the quality evaluation involves numerous facets, and a quantitative evaluation is rare. The aim of this study was to quantitatively evaluate the quality of a GSPG based on three aspects. The fuzzy analytic hierarchy process (FAHP) was adopted to obtain the final score and quality classification of the GSPG. Based on three aspects, namely, integrity, continuity, and sturdiness, a series of field tests was also conducted, qualitatively evaluating the quality of the GSPG preliminary, to obtain the required test data and verify the FAHP results. The results of the FAHP showed that the quality of the GSPG was 86.42, which could be classified as “Good”, whereas the field tests exhibited that the GSPG was effective, thereby verifying that the FAHP was reliable. In addition, the proposed method provided a detailed comprehension of the quality evaluation of GSPG and a frame of reference for analogous engineering.
机译:使用单因素通常评估地面预路(GSPG)的质量;然而,质量评估涉及众多方面,并且定量评估是罕见的。本研究的目的是根据三个方面定量评估GSPG的质量。采用模糊分析层次处理(FAHP)获得GSPG的最终得分和质量分类。基于三个方面,即完整性,连续性和强硬化,还进行了一系列现场测试,定性评估了GSPG初步的质量,以获得所需的测试数据并验证FAHP结果。 FAHP的结果表明,GSPG的质量为86.42,可以归类为“良好”,而现场测试表明GSPG是有效的,从而验证FAHP是可靠的。此外,所提出的方法提供了对GSPG的质量评估的详细理解和类似工程的参考框架。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号