...
首页> 外文期刊>EPJ Web of Conferences >Preparing CERN Tier-0 data centres for LHC Run 3
【24h】

Preparing CERN Tier-0 data centres for LHC Run 3

机译:准备CERN Tier-0数据中心为LHC运行3

获取原文

摘要

Since 2013 CERN’s local data centre combined with a colocation infrastructure at the Wigner data centre in Budapest [1] have been hosting the compute and storage capacity for Worldwide LHC Computing Grid (WLCG) [2] Tier-0. In this paper we will describe how we try to optimize and improve the operation of our local data centre to meet the anticipated increment of the physics compute and storage requirements for Run 3, taking into account two important changes on the way: the end of the co-location contract with Wigner in 2019 and the loan of 2 out of 6 prefabricated compute modules being commissioned by the LHCb experiment [3] for their online computing farm.
机译:自2013年以来,Cern的本地数据中心与布达佩斯的Wigner数据中心联合的集电基础架构[1]一直在托管全球LHC计算网格(WLCG)[2] Tier-0的计算和存储容量。在本文中,我们将描述我们如何尝试优化和改进本地数据中心的运行,以满足运行3的物理计算和存储要求的预期增量,同时考虑到途中的两个重要变化:结束2019年与Wigner的共同位置合同,其中6个由LHCB实验委托的6个预制计算模块中的2个贷款为他们的在线计算场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号