首页> 外文期刊>IFAC PapersOnLine >A case study of photovoltaic power generation and its future ramp possibility for Tokyo electric power area
【24h】

A case study of photovoltaic power generation and its future ramp possibility for Tokyo electric power area

机译:光伏发电和东京电力区域未来斜坡可能性的案例研究

获取原文
获取外文期刊封面目录资料

摘要

A case study of rapid variation (ramp event) of photovoltaic (PV) power generation on 18 April 2016 for the Tokyo Electric Power Company (called “TEPCO”) power area is considered in this study. PV system installation in the TEPCO area has been increasing (approximately 10 GW PV system capacity). Quasi real-time monitoring of PV power generation by using satellite-estimated solar radiation is performed. Under assumptions of future PV system installation scenarios (from 21.78 GW to 85.76 GW in the TEPCO area), temporal and spatial variations of PV power generation are estimated.
机译:在本研究中考虑了2016年4月18日至2016年4月18日的光伏(PV)发电快速变化(斜坡事件)的案例研究(称为“Tepco”)功率区域。 PV系统在Tepco地区的安装一直在增加(大约10 GW PV系统容量)。进行了通过使用卫星估计的太阳辐射进行PV发电的准实时监测。在未来的PV系统安装方案的假设下(Tepco地区的21.78 GW到85.76 GW),估计光伏发电的时间和空间变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号