...
首页> 外文期刊>Journal of Ecological Engineering >Efficiency of Pollution Removal in Preliminary Settling Tanks of Household Wastewater Treatment Plants in the Roztocze National Park
【24h】

Efficiency of Pollution Removal in Preliminary Settling Tanks of Household Wastewater Treatment Plants in the Roztocze National Park

机译:Roztocze国家公园家庭废水处理厂初步沉降坦克污染效率

获取原文

摘要

The paper presents an evaluation of the pollutant removal efficiencies of four primary settling tanks that were components of on-site domestic wastewater treatment plants located in the Roztocze National Park in Poland. We studied two four-chamber settling tanks which were elements of the technological lines of activated sludge treatment plants, and two three- chamber settling tanks which provided primary treatment in hybrid constructed wetlands. The tests were conducted in the years 2017–2019. During this period, wastewater samples for analysis were collected from the first chamber (raw wastewater) and the last chamber (primary settled wastewater) of each settling tank. We tested the following pollution parameters: total suspended solids (TSS), BOD5, COD, total nitrogen (TN), and total phosphorus (TP). The following mean pollutant removal efficiencies were obtained for the four-chamber settling tanks: TSS – 68.3%, BOD5 – 50.4%, and COD – 49.5%; the three-chamber settling tanks were much less efficient at reducing those pollution parameters: 50.9%, 17.0%, and 2.3%, respectively. Neither the three-chamber nor the four-chamber settling tanks ensured effective elimination of biogenic compounds. In most cases, the concentrations of TN and TP in primary settled wastewater were higher compared to raw sewage, which means that these elements were being released from sewage sludge during treatment. Despite this finding, the study shows that a primary settling tank should be used as a basic component of any domestic wastewater treatment plant, as it ensures a considerable reduction in TSS and organic matter.
机译:本文介绍了四个主要沉降坦克的污染物去除效率的评估,该储罐是位于波兰的Roztocze国家公园的现场国内废水处理厂的组件。我们研究了两个四室沉降罐,该储罐是活性污泥处理厂的技术线条的元素,以及两个三腔沉降罐,其在杂交构造的湿地中提供了初级处理。测试是在2017-2019年进行的。在此期间,从第一腔室(原料废水)和每个沉降罐的最后一室(主要沉降废水)收集用于分析的废水样品。我们测试了以下污染参数:总悬浮固体(TSS),BOD5,COD,总氮(TN)和总磷(TP)。为四室沉降罐获得以下平均污染物去除效率:TSS - 68.3%,BOD5-50.4%和COD - 49.5%;三室沉降坦克在减少污染参数时效率低得多:50.9%,17.0%和2.3%。三室和四室沉降罐都没有确保有效地消除生物化合物。在大多数情况下,与原始污水相比,初级沉淀废水中TN和TP的浓度较高,这意味着这些元素在治疗过程中被从污水污泥释放。尽管如此,该研究表明,主要沉降罐应用作任何国内废水处理厂的基本组件,因为它确保了TSS和有机物质的相当大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号