首页> 外文期刊>Revista de la construccion >Study of relationship between rework and labor productivity in Building Construction Projects
【24h】

Study of relationship between rework and labor productivity in Building Construction Projects

机译:建筑施工项目返工与劳动生产力的关系研究

获取原文
           

摘要

MAHAMID, Ibrahim. Study of relationship between rework and labor productivity in Building Construction Projects. Revista de la Construcción [online]. 2020, vol.19, n.1, pp.30-40. ISSN 0718-915X.? http://dx.doi.org/10.7764/rdlc.19.1.30-41. The objectives of this study included: (1) identifying the factors affecting construction labor productivity, (2) identifying the causes of rework in building projects, (3) addressing the relationship between labor productivity and rework using regression analysis based on data collected from building projects implemented in Palestine. The following steps were used in this study: (1) Questionnaire survey - stage 1: a questionnaire survey was carried out to identify the main factors affecting labor productivity and the main causes of rework on construction sites, (2) Questionnaire survey - stage 2: after identifying the significant causes of rework using factor analysis, a questionnaire survey was conducted to address the impact of these significant causes on labor productivity, (3) Prediction models: Data collected from 40 building construction projects were used to establish the regression models that describe the relation between rework and labor productivity on construction sites. The study concluded that the top factors affecting labor productivity are: lack of labor experience, payments delay, rework due to labor mistakes, lack of supervisor’s experience and materials shortage. The study also found that the top five rework causes in building projects are: lack of manpower skills, non-compliance with specifications, frequent change orders, inadequate job planning, and inadequate coordination and integration. Using regression analysis for data collected from 40 building construction projects, three predictive models were developed. The models indicated a significant relation between rework cost and labor productivity i.e the higher the rework cost the lower the construction productivity. This study is the first one that investigated the relationship between construction productivity and rework in Palestine, and that is why it is very important. Results would be helpful for researchers and construction professionals.
机译:玛哈达姆,易卜拉欣。建筑工程建设项目返工与劳动生产力的关系研究。 Revista de laConstucción[在线]。 2020,Vol.19,N.1,PP.30-40。 ISSN 0718-915x。? http://dx.doi.org/10.7764/rdlc.19.1.30-41。本研究的目标包括:(1)确定影响建筑劳动生产率的因素,(2)确定建筑项目的返工原因,(3)使用基于建筑物收集的数据的回归分析解决劳动生产率与返工之间的关系在巴勒斯坦实施的项目。本研究中使用了以下步骤:(1)调查问卷调查 - 第1阶段进行调查,进行了调查调查,以确定影响劳动生产率的主要因素和建筑工地返工的主要原因,(2)调查问卷调查 - 第2阶段:在使用因子分析确定返工的重要原因后,进行了调查调查,以解决这些重大原因对劳动生产率的影响,(3)预测模型:从40个建筑施工项目中收集的数据用于建立回归模型描述建筑工地返工与劳动生产率的关系。这项研究得出结论,影响劳动生产率的最大因素是:缺乏劳动经验,延迟延迟,由于劳动力错误而返工,缺乏主管的经验和材料短缺。该研究还发现,建设项目的五大返工原因是:缺乏人力技能,不遵守规范,频繁更改订单,工作规划不足,协调和整合不足。利用回归分析从40个建筑项目收集的数据,开发了三种预测模型。该模型表明了返工成本和劳动生产力之间的重要关系,即返工成本越高,施工生产率越低。本研究是第一个调查巴勒斯坦建筑生产力和返工之间关系的人,这就是为什么它非常重要。结果对研究人员和建筑专业人员有所帮助。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号