...
首页> 外文期刊>Natural Hazards and Earth System Sciences Discussions >Causes and consequences of the sinkhole at El Trébol of Quito, Ecuador –implications for economic damage and risk assessment
【24h】

Causes and consequences of the sinkhole at El Trébol of Quito, Ecuador –implications for economic damage and risk assessment

机译:厄瓜多尔 - 以经济损害及风险评估厄瓜多尔 - 厄瓜多尔 - 以厄瓜多尔郡的污水池导致及后果

获取原文
           

摘要

The so-called El Trébol is a critical road interchange in Quito connecting the north and south regions of the city. In addition, it connects Quito with the highly populated Los Chillos Valley, one of the most traveled zones in the Ecuadorian capital. El Trébol was constructed in the late 1960s in order to resolve the traffic jams of the capital city and for that purpose the Machángara River was rerouted through an underground concrete box tunnel. In March 2008, the tunnel contained a high amount of discarded furniture that had been impacting the top portion of the tunnel, compromising the structural integrity. On 31?March 2008 after a heavy rainfall a sinkhole of great proportions formed in the Trébol traffic hub. In the first few minutes, the sinkhole reached an initial diameter of 30?m. The collapse continued to grow in the following days until the final dimensions of 120?m in diameter and some 40?m of depth, revealing the Machángara River at the base of the sinkhole.A state of emergency was declared. The cause of the sinkhole was a result of the lack of monitoring of the older subterranean infrastructure where trash had accumulated and damaged the concrete tunnel that channelized the Machángara River until it was worn away for a length of some 20?m, leaving behind the sinkhole and the fear of recurrence in populated areas.With the intent to understand the causes and consequences of this sinkhole event, rainfall data are shown together with hydrogeological characteristics and a view back to the recent history of sinkhole lineation or arrangement of the city of Quito. The economic impact is also emphasized, where the direct costs of the damage and the reconstruction are presented and compared to indirect costs associated with this socio-natural disaster. These analyses suggest that the costs of indirect financial damage, like time loss or delay, and subsequent higher expenses for different types of vehicles, are equivalent to many times the costs of the reconstruction of El Trébol.
机译:所谓的ElTrébol是连接城市北部和南部地区的基多的关键道路交汇处。此外,它还与厄瓜多尔首都最大旅行的区域之一是高度人口稠密的LOS CHILLOS山谷。 ElTrébol是在20世纪60年代后期建造的,以解决首都的交通堵塞,并且为此目的,Machángara河通过地下混凝土盒隧道重新排出。 2008年3月,隧道含有大量丢弃的家具,这一直影响隧道顶部,损害了结构完整性。在31年3月31日(2008年3月)大雨后,Trébol交通枢纽中形成的大量比例的污水池。在最初的几分钟内,下沉孔达到初始直径为30?m。崩溃在接下来的日子里继续增长,直到直径120?m的最终尺寸和大约40米的深度,揭示了污水底部的Machángara河。宣布了紧急状态。陷阱的原因是缺乏对旧地下基础设施的监测的结果,其中垃圾累积和损坏了将Machángara河流引发的混凝土隧道,直到它磨损了约20?米的长度,留下了污水而且害怕人口稠密地区的复发。目的意图了解这个污水井事件的原因和后果,降雨数据与水文地质特征一起显示,并返回最近陷入困境的陷阱基地精致历史或基多市的安排。还强调了经济影响,造成损害和重建的直接成本,并与与此社会自然灾害相关的间接成本进行了比较。这些分析表明,间接财务损害的成本,如时间损失或延迟,以及不同类型车辆的更高费用,相当于ELRébol重建的多次成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号