An Uncertain Resource Constrained Scheduling Model Based on Uncertainty Theory

机译:基于不确定性理论的不确定资源约束调度模型

获取原文
           

摘要

Resource constrained project scheduling problem is to make a schedule for minimizing of the completion time or total cost subject to precedence rules and resource constraints. Traditional resource constrained project scheduling problem research takes into account achieve management goal in certain environment. However, there are many uncertainties in practical projects due to the uncertain factors, which leads to the change of resource availability. In this paper, for better described the uncertain resource constrained project scheduling problem, we firstly consider the uncertain resource availability project scheduling problem based on uncertainty theory. To meet the manger goals, it is assumed that the increased quantities of resource are uncertain variables and the finish time of each activity is a decision variable. Then, an uncertain resource constrained model is built. The goals of the model are to minimize the completion time and the total cost which composed by the activity cost and the additional resource cost. One of the constraints is the finish-start precedence relationship among the project activities. The other constraint is the resource constraint in which the demand of resource shall not exceed the total supply of resource for each resource type at any time. Furthermore, the equivalent form of the above model is given and its equivalence is proved. Finally, a genetic algorithm is applied to search for quasi-optimal scheduling, and a project example is given to illustrate the effectiveness of the model.
机译:资源受限的项目调度问题是为了最小化完成优先级规则和资源约束的完井时间或总成本的计划。传统资源受限的项目调度问题研究考虑到某些环境中实现管理目标。然而,由于不确定的因素,实际项目中存在许多不确定性,这导致资源可用性的变化。在本文中,为了更好地描述不确定的资源受限的项目调度问题,我们首先考虑了基于不确定性理论的不确定资源可用性项目调度问题。为了满足管理员目标,假设增加量的资源量是不确定的变量,并且每个活动的完成时间是决策变量。然后,构建了不确定的资源约束模型。该模型的目标是最小化完成时间和由活动成本和额外资源成本组成的总成本。其中一个约束是项目活动之间的完成开始的优先关系。另一个约束是资源限制,其中资源的需求不得随时超过每个资源类型的资源总额。此外,给出了上述模型的等同形式,并证明了其等价。最后,应用遗传算法来搜索准优化调度,并且给出了项目示例来说明模型的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号