Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan

机译:金融管理不善:巴基斯坦大型建筑项目中的时间和成本超支的主要原因

获取原文
   

获取外文期刊封面封底 >>

       

摘要

One important and well-known issue for the majority of construction projects such as buildings, roads, bridges, airports and many more projects all over the world is time and cost overrun. Project pricing and time period delay are also major issues. The current investigation is taking into consideration the mega construction projects in the provinces of Pakistan, looking into various components controlling and dominating time and cost overrun. A total of 29 factors were identified from literature work and one questionnaire was designed and distributed among 160 respondents. All collected data were analyzed by the average index method. Factors having value more than 3.6 were selected as main factors of cost and time overrun, and five factors were revealed to surpass this barrier. Time and cost overrun are of the leading financial mismanagement issues of the economy of Pakistan. This study will be helpful for stakeholders to control both cost and time overrun in the mega construction projects of Pakistan.
机译:大多数建筑项目的一个重要和众所周知的问题,如建筑物,道路,桥梁,机场和世界各地的更多项目是时间和成本超支。项目定价和时间段延迟也是主要问题。目前调查正在考虑巴基斯坦省的大型建设项目,调查各种组成部分控制和支配时间和成本超支。从文献工作中确定了29个因素,并在160名受访者中设计并分发了一个问卷。通过平均指数方法分析所有收集的数据。选择具有超过3.6的价值的因素被选为成本和时间超支的主要因素,并揭示了五种因素来超越这一屏障。时间和成本超支是巴基斯坦经济的领先金融管理问题。这项研究将有助于利益相关者控制巴基斯坦大型建筑项目中的成本和时间超支。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号