首页> 外文期刊>Archives of mining sciences >A New Prediction Model of Surface Subsidence with Cauchy Distribution in the Coal Mine of Thick Topsoil Condition
【24h】

A New Prediction Model of Surface Subsidence with Cauchy Distribution in the Coal Mine of Thick Topsoil Condition

机译:厚表土煤矿煤矿地表塌方的新预测模型

获取原文
           

摘要

Coal is the main energy source in China, but its underground mining causes surface subsidence, whichseriously damages the ecological and living environments. How to calculate subsidence accurately is a coreissue in evaluating mining damage. At present, the most commonly used method of calculation is theProbability Integral Method (PIM), based on a normal distribution. However, this method has limitationsin thick topsoil (thickness > 100 m), in that the extent of the calculated boundary of the subsidence basinis smaller than its real extent, and this has an undoubted impact on the accurate assessment of the extentof mining damage. Therefore, this paper introduces a calculation model for surface subsidence based ona Cauchy distribution for thick topsoil conditions. This not only improves the accuracy of calculation at thesubsidence basin boundary, but also provides a universal method for the calculation of surface subsidence.
机译:煤炭是中国的主要能源来源,但它的地下采矿导致表面沉降,这让人损害了生态和生活环境。如何准确计算沉降是评估挖掘损坏的核心。目前,基于正态分布,最常用的计算方法是可实现的积分方法(PIM)。然而,该方法具有限制厚的表土(厚度> 100米),其方面计算的沉降基础的边界小于其实际程度,这对准确评估采矿损害的准确评估具有毫无疑问的影响。因此,本文介绍了基于厚表土条件的基于表面沉降的计算模型。这不仅提高了Chsubsity盆地边界的计算的准确性,而且还提供了用于计算表面沉降的通用方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号