首页> 外文期刊>American Journal of Engineering Research >Assessment of Indices of Building Project Quality Control Checklist in the South-Eastern States of Nigeria
【24h】

Assessment of Indices of Building Project Quality Control Checklist in the South-Eastern States of Nigeria

机译:尼日利亚东南部国家建设项目质量控制清单指标的评估

获取原文
           

摘要

Production of a good quality building depends among other variables the construction methodologies,project quality management plan and project health and safety plan. Achievement of the quality management plandepends largely on a checklist document to guide on the workmanship, construction material, inspection, materialsampling and testing. 62 variables were considered as important parameters that constitute the checklist document.The 62 variables were grouped under 8 sub-headings namely subsurface, timber, formwork, concretework, steelreinforcement, blockwork, rendering and roofing. Assessment was done a Likert 5 point scale and was analysedusing weighted average mean index (Iimp) which ranged from -2 to 2. The subsurface sub-sector ranked first with amean score of 1.5752 followed by the roofing sub-sector. The least is blockwork with a mean score of 1.3297followed by the rendering sub-sector with a mean score of 1.3492. Out of the 900 copies of structuredquestionnaires administered, 730 responded which is a return rate of 81.1 percent. The building professional bodiesand all levels of the government regulatory agencies to provide quality control checklist and approved system forbuilding project monitoring.
机译:生产优质建筑的生产依赖于其他变量施工方法,项目质量管理计划和项目健康和安全计划。在很大程度上在核对清单文件上实现质量管理融合物,以指导工艺,建筑材料,检查,材料采样和测试。 62变量被视为构成清单文档的重要参数。62个变量在8个子标题下分组,即地下,木材,模板,混凝土,钢合钢铁,砌块,渲染和屋顶。评估是一种李克特5分尺度,并分析了从-2到2的加权平均平均指数(IIMP),该索引从-2到2中排名第一次排名第一。屋顶子部门的AMEAN得分为1.5752。最少的是,平均得分为1.3297的渲染子扇区的平均得分为1.3492。在管理的900份副本中,730份回复率为81.1%。建筑专业士兵和各级政府监管机构提供质量控制清单和批准的制度福利项目监测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号