首页> 外文期刊>Procedia Computer Science >Project Interdependency Management in IT/IS Project Portfolios: From a Systems Perspective
【24h】

Project Interdependency Management in IT/IS Project Portfolios: From a Systems Perspective

机译:从系统角度看IT / IS项目组合中的项目相互依赖性管理

获取原文
       

摘要

Capitalizing on inter-project interdependencies is widely accepted as being crucial for Information Technology/Information Systems (IT/IS) project portfolio success. However, handling these interdependencies becomes a source of increased management complexity as project portfolios get larger, increasingly diverse, and are much influenced by their environments. This then can lead to less predictable situations regarding the portfolio performance as a whole. Though there are many methods available for optimally selecting projects and cross-checking possible synergies and interdependencies among the projects in the portfolio, it remains unclear how one can gain control over the complexity of managing these interdependencies. In this study, we address the problem of handling many project interdependencies that continuously change and develop within a large IT/IS project portfolio. We found that the existing methods for selecting and managing the projects within a portfolio do not focus enough on how interdependencies can disrupt the balance of the whole project portfolio system. To tackle the problem, we propose a systemic approach using the Viable System Model to enhance the way that these interdependencies can be effectively managed in view of the overall portfolio system. We suggest that the Viable System Model, as a supplement to traditional IT/IS project portfolio management approaches, is recursively applied to diagnose and manage the complexity of project interdependencies within IT/IS project portfolios.
机译:充分利用项目间的相互依存关系对于信息技术/信息系统(IT / IS)项目组合的成功至关重要。但是,随着项目组合变得越来越大,越来越多样化,并且受其环境的影响很大,处理这些相互依赖关系成为管理复杂性增加的根源。然后,这可能导致就整个投资组合绩效而言难以预测的情况。尽管有许多方法可以最佳地选择项目并交叉检查投资组合中项目之间可能的协同作用和相互依赖关系,但仍不清楚如何获得控制这些相互依赖关系的复杂性的方法。在这项研究中,我们解决了处理许多项目相互依赖关系的问题,这些依赖关系在大型IT / IS项目组合中不断变化和发展。我们发现,现有的用于选择和管理项目组合中项目的方法还不足以集中于相互依赖关系如何破坏整个项目项目组合系统的平衡。为了解决该问题,我们提出了一种使用可行系统模型的系统方法,以增强从整体投资组合系统的角度出发,可以有效管理这些相互依赖性的方式。我们建议将可行系统模型作为对传统IT / IS项目组合管理方法的补充,以递归方式应用于诊断和管理IT / IS项目组合中项目相互依赖性的复杂性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号