An Integrated Method for Ranking of Risk in BOT Projects

机译:BOT项目风险等级的综合方法

获取原文
       

摘要

In BOT approach, the private sector is granted a concession to plan, design, construct, operate and maintain a project in a certain period of time and after that it should be transferred to the government. Risk is the cumulative effect of the chances of uncertain occurrences which will adversely affect project objectives. It is the degree of exposure to negative events and their probable consequences.In this paper, at first the risks of the BOT projects are identified, then we rank the risks based on their severity and effect on project objectives (time, cost, quality, safety and environmental) by two methods, namely FTOPSIS and FSAW. In the next stage obtained results by NGT method are integrated. After wise the occurrence and detection values of each risk are determined by experts and ultimately the risks are evaluated according to risk priority number (RPN) of failure mode and effect analysis (FMEA) technique.
机译:在BOT方法中,授予私营部门在一定时期内计划,设计,建造,运营和维护项目的特许权,然后将其转让给政府。风险是不确定事件发生的机会的累积影响,会对项目目标产生不利影响。在本文中,首先要确定BOT项目的风险,然后根据风险的严重性和对项目目标的影响(时间,成本,质量,安全和环境)两种方法,即FTOPSIS和FSAW。在下一阶段,将通过NGT方法获得的结果进行整合。明智的做法是,由专家确定每种风险的发生和检测值,并最终根据故障模式的风险优先级数(RPN)和效果分析(FMEA)技术评估风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号