An empirical analysis of the relationship between cost of control activities and project management success

机译:控制活动成本与项目管理成功之间关系的实证分析

获取原文

摘要

To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS) with cost of control (COC) activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.
机译:为了实现持续改进计划的目标,施工经理必须将质量的实现与成本联系起来。本文旨在以经验的方式将项目管理成功(PMS)与控制成本(COC)活动相关联。因此,目的是确定COC活动影响PMS的程度。采用定量方法通过邮政和电子邮件调查从马来西亚建筑公司收集数据。使用相关性和简单的线性回归分析来检验假设。这项研究的结果表明,COC活性与PMS正相关。从这项研究中获得的经验证据为所有质量改进工作提供了经济依据。这可以帮助建筑承包商减少因质量低劣,成本超支和延误而导致的业务失败水平,从而提高项目管理的成功率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号