Scheduling Construction Projects Under Fuzzy Modelling of Resource Constraints

机译:资源约束模糊建模的建设项目进度计划。

获取原文
           

摘要

Paper presents the original method of construction scheduling using fuzzy sets theory. The essence of the method is to obtain an optimal construction schedule based on the solution of the fuzzy RCPS problem with flexible restrictions. The article introduces two important modifications of the considered issue. These modifications are: maximization of the degree of fulfillment of customer preferences regarding the time span of the project implementation and the contractor's preference regarding the level of use of renewable resources, for example - the level of employment of workers. The article also contains a numerical example showing the procedure for applying the described method.
机译:论文提出了使用模糊集理论的施工进度计划的原始方法。该方法的本质是基于具有柔性约束的模糊RCPS问题的解决方案来获得最佳施工进度。本文介绍了所考虑问题的两个重要修改。这些修改是:最大程度地满足客户对项目实施时间的喜好程度,以及承包商对可再生资源的使用水平(例如,工人的就业水平)的偏爱。该文章还包含一个数字示例,显示了应用所述方法的过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号