...
首页> 外文期刊>E3S Web of Conferences >Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University
【24h】

Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

机译:开发规划信息系统中的企业架构规划:以三宝垄州立大学为例

获取原文
           

摘要

This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the planner unit in realizing the budget that has been designed. It also proves that the value chain of the information planning system has brought implications for budget realization.
机译:本研究应用了计划信息系统的集成设计和开发,该系统是使用企业体系结构计划进行设计的。进行计划与预算的实现之间经常存在差异,导致计划无效,这是进行此项研究的原因之一。使用EAP的设计旨在使开发保持一致并与组织的战略方向保持一致。在实践中,EAP在计划启动,业务功能的识别和定义的多个阶段中进行,然后进行架构设计和已建立的EA实施计划。除了企业体系结构的设计之外,本研究还进行了实施,并通过黑盒和白盒的几种方法进行了测试。黑匣子测试方法用于测试软件的基本方面,通过两种测试进行测试,一种是使用用户验收测试,第二种是使用软件功能测试。白盒测试方法用于测试软件中代码的有效性,并使用单元测试进行测试。使用集成计划信息系统上的白盒和黑盒进行的测试被宣布为成功。如果所构建的软件与之前的情况以及开发此集成计划信息系统之间没有任何区别,则无法确定软件测试是否成功。为了确保该系统实现的成功,作者测试了数据计划与信息系统在先使用直到使用后信息系统之间的一致性。通过减少计划和实现时间的时间数据来完成此一致性测试。从列表数据中,已构建的计划信息系统减少了计划时间与实现时间之间的差异,这表明计划信息系统可以激励计划者单位实现已设计的预算。这也证明了信息计划系统的价值链为预算的实现带来了影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号