A Study On Project Planning Using The Deterministic And Probabilistic Models By Network Scheduling Techniques

机译:基于网络调度技术的确定性和概率模型的项目计划研究

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Project planning is the important task in many areas like construction, resource allocation and many. A sequence of activities has to be performed to complete one task. Each activityhas its unique processing time and all together to identify the critical activities which affect the completion of the project. In this paper the probabilistic and deterministic models to determine the project completion time and also the critical activities are considered. A case study on building construction project has been performed to demonstrate the application of the above said models. The two project scheduling namely PERT and CPM are used to determine numerically the different types of floating times of each activity and hence determined the critical path which plays an important role in the project completion......
机译:项目规划是许多领域(如建筑,资源分配等)中的重要任务。必须执行一系列活动才能完成一项任务。每个活动都有其独特的处理时间,并且一起确定影响项目完成的关键活动。本文考虑了确定项目完成时间以及关键活动的概率模型和确定性模型。对建筑工程项目进行了案例研究,以证明上述模型的应用。 PERT和CPM这两个项目计划用于数字确定每种活动的浮动时间的不同类型,从而确定在项目完成中起重要作用的关键路径。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号