...
首页> 外文期刊>IFAC PapersOnLine >Supply Chain Scheduling: A Motorcycle Assembly Case Study
【24h】

Supply Chain Scheduling: A Motorcycle Assembly Case Study

机译:供应链计划:摩托车装配案例研究

获取原文

摘要

This paper presents a case study of a dynamic approach to scheduling activities in a supply chain. The case study deals with a motorcycle assembly facility located in Manaus, Brazil. It is the third largest motorcycle assembly facility in the world. The supply chain operations were formulated as a network of 55 activities competing for 66 resources. The method was able to provide a set of feasible solutions in under 2 seconds of computing time. The proposed approach can be implemented on desk top, web, or mobile platforms.
机译:本文介绍了一种动态方法来计划供应链中的活动的案例研究。案例研究涉及位于巴西马瑙斯的摩托车装配厂。它是世界第三大摩托车组装厂。供应链业务由55个活动争夺66个资源的网络组成。该方法能够在不到2秒的计算时间内提供一套可行的解决方案。可以在桌面,Web或移动平台上实现所提出的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号