...
首页> 外文期刊>Journal of the Institute of Engineering >Post Disaster Reconstruction after 2015 Gorkha Earthquake: Challenges and Influencing Factors
【24h】

Post Disaster Reconstruction after 2015 Gorkha Earthquake: Challenges and Influencing Factors

机译:2015年哥尔卡地震后的灾后重建:挑战和影响因素

获取原文
           

摘要

The Gorkha earthquake on April 25, 2015 has significantly affected the livelihood of people and overall economy in Nepal, causing severe damage and destruction in central Nepal including nation's capital. 800 thousand buildings were affected leaving 8 million people homeless. Challenge of reconstruction of optimum 800 thousand houses is arduous for Nepal Government in background of its turmoil political scenario and weak governance apart from its difficult geographical terrain. Albeit, with significant number of stakeholders involved in the reconstruction process, no appreciable progress has seen to the ground till date, which is reflected over the frustration of affected people. In order to identify factors hindering timely and quality reconstruction, this research has brought basic arguments and ideas prospected by different actors involved in the process. Methodology of the study is comprised with semi structured interviews with social mobilizers, engineers working in the field, and affected people, group discussion, field observations and regular follow-up of the incidents through national newspapers and discussion forums. This study concludes that inaccessibility, absence of local government, weak governance, weak infrastructures, lack of preparedness, knowledge gap and manpower shortage etc. are the key challenges of the reconstruction after 2015 earthquake in Nepal. Good governance, integrated information, addressing technical issues, public participation along with short term and long term strategies to tackle with technical issues are highlighted as some imperative factors for timely and quality reconstruction in context of Nepal. Journal of the Institute of Engineering , 2018, 14(1): 52-63.
机译:2015年4月25日发生的戈尔卡地震严重影响了尼泊尔人民的生活和整体经济,在尼泊尔中部(包括首都)造成了严重破坏和破坏。 80万建筑物受到影响,使800万人无家可归。在尼泊尔政局动荡,治理不善,地理条件不佳的背景下,重建最佳80万所房屋面临着艰巨的挑战。尽管有大量的利益相关者参与了重建过程,但迄今为止尚未取得实质性进展,这反映在受影响人民的沮丧中。为了确定阻碍及时和高质量重建的因素,本研究提出了参与该过程的不同参与者所提出的基本论点和想法。该研究的方法包括与社会动员者,在野外工作的人和受影响的人进行半结构化访谈,小组讨论,实地观察以及通过国家报纸和讨论论坛对事件进行定期跟踪。这项研究得出的结论是,交通不便,地方政府缺位,治理薄弱,基础设施薄弱,准备不足,知识缺口和人力短缺等是尼泊尔2015年地震后重建的主要挑战。尼泊尔强调了善政,综合信息,解决技术问题,公众参与以及解决技术问题的短期和长期战略,这是在尼泊尔进行及时和高质量重建的一些必要因素。工程学院学报,2018,14(1):52-63。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号