首页> 外文会议>Construction Research Congress >Factors Contributing Building Reconstruction and Renovation Challenges: A Case Study after April 2015 Gorkha Earthquake
【24h】

Factors Contributing Building Reconstruction and Renovation Challenges: A Case Study after April 2015 Gorkha Earthquake

机译:有贡献建设重建与改造挑战的因素 - 以2015年4月Gorkha地震后的案例研究

获取原文

摘要

The earthquake on April 25, 2015, in Nepal damaged thousands of houses; thereby leaving millions of people homeless. Most of the damaged buildings were mud and brick or stone bonded load-bearing structure. After the earthquake, there has been a lot of building reconstruction and renovation works going on in Nepal. During this phase, homeowners have faced many challenges such as inaccessibility to the construction site, scarcity of materials and equipment, and workforce shortage. Although few studies have explored the challenges during reconstruction in general, a thorough understanding of factors contributing to the obstacles is lacking. The objective of this paper is to present a detailed analysis of the factors contributing to building reconstruction and renovation challenges. A thorough literature review and interviews were conducted which helped to identify critical factors contributing to building reconstruction and renovation challenges. This study identified the top significant factors among reconstruction challenges in Nepal after the Gorkha earthquake. The top five significant factors are: a) dispute among family members on property, b) vested interest and corruption, c) lack of skilled laborer, d) lack of adopting and updating building codes, and e) lack of proper training on how to use new tools and techniques. The study also ranked the building materials and typology that suffered most damage during the Gorkha earthquake. Unreinforced mud or adobe building, unreinforced brick masonry building with mud mortar and timber floor, and stone masonry building with mud mortar were critical in each case. The findings can be used by construction professionals to improve their management strategies during pre-construction and be aware of top contributing factors during reconstruction and renovation process. The results will also help project managers, field engineers, and contractors in the understanding of building materials and typology that are vulnerable to earthquake.
机译:2015年4月25日的地震,在尼泊尔损坏了成千上万的房屋;从而离开数百万人无家可归者。大多数受损建筑是泥土和砖块或石材粘合承载结构。地震发生后,尼泊尔有很多建筑重建和改造作品。在此阶段,房主面临着许多挑战,例如对施工现场,材料和设备稀缺的可接触,以及劳动力短缺。虽然很少有研究在重建期间探讨了挑战,但缺乏对障碍有助于障碍的因素的彻底了解。本文的目的是对有助于建立重建和改造挑战的因素进行详细分析。进行了彻底的文献综述和访谈,有助于确定有助于建立重建和改造挑战的关键因素。本研究确定了Gorkha地震后尼泊尔重建挑战中的最重要因素。五大意义因素是:a)家庭成员的争议,b)既得利益和腐败,c)缺乏熟练的劳动者,d)缺乏采用和更新的建筑规范,而e)缺乏适当的培训使用新工具和技术。该研究还在Gorkha地震期间排名建筑材料和类型。没有原因泥浆或土坯建筑,用泥浆和木材地板,以及带泥浆砂浆的石材砌体建筑在每种情况下都是至关重要的。该调查结果可供建筑专业人员使用,以改善预制型在建设中的管理策略,并在重建和改造过程中意识到最大贡献因素。结果还将帮助项目经理,现场工程师和承包商理解易受地震的建筑材料和类型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号