Data exploration on factors that influences construction cost and time performance on construction project sites

机译:关于影响建设项目工地成本和时间绩效的因素的数据探索

获取原文
           

摘要

This data article explores the factors that contribute to maintaining steady cost projection on construction projects. The data was obtained using structured questionnaire designed in Likert scale. The responses were solicited from category of construction practitioners. Simple random sampling was employed in the distribution of the questionnaires to the respondents. Data samples were analysed using severity index, ranking and simple percentages. The analysis of the data brought to fore some important data on factors that causes cost overrun, they include: contractor's inexperience, inadequate planning, inflation, incessant variation order, and change in project design. They are critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are found to be responsible. The data fall within the percentages of possible consequences of cost overrun when compared with those available in scientific literature. The data can provide insights on how to mitigate the risks of project deviation from initial cost and as-built project.
机译:本数据文章探讨了有助于维持对建设项目的稳定成本预测的因素。使用利克特量表设计的结构化问卷获得数据。答复是从建筑从业人员类别中征集的。在向受访者分发问卷时,采用了简单的随机抽样。使用严重性指数,排名和简单百分比对数据样本进行分析。对数据的分析提出了一些导致成本超支的重要数据,其中包括:承包商的经验不足,计划不足,通货膨胀,不断变化的变更单以及项目设计的变更。它们是导致成本超支的关键,而项目复杂性,项目周期的缩短和欺诈行为被认为是造成损失的原因。与科学文献中提供的数据相比,数据属于成本超支的可能后果百分比之内。数据可以提供有关如何减轻项目偏离初始成本和竣工项目的风险的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号